Data-centre engineering infrastructure and operation

A data centre from first discussion to commissioning

We write the functional requirements and the brief, run pre-design and design, check and accept equipment, prove the system in testing and put the site into operation.

Feed 110 kV · utility Feed 210 kV · utility Gensetsfuel 24 h TS · ATS0.4 kV switchboard · switchover in seconds UPS · batteriesdouble conversion · 2N Data hallIT load CoolingN+1 BMSDCIMevent → shift
PowerCoolingTeamControlProcessesData
15+ yearsin operation and construction
40 MW+of infrastructure under management
99.9%+network availability under our operation
20+engineers on project teams
10+ data centrescommissioned

Site lifecycle

The full management cycle, at any stage

  1. 1Audit and FR

    site survey, client goals, capacity, reliability, phases

  2. 2Pre-design brief

    scope and volume of pre-design work

  3. 3Pre-design

    concept, energy balance, layout, budget

  4. 4Design brief

    requirements for the design and related sections

  5. 5Design

    support of decisions at the design and working-documentation stages

  6. 6Procurement

    equipment specification, suppliers, contract terms

  7. 7Acceptance

    equipment under FAT, SAT and SAP

  8. 8Construction and start-up

    technical supervision, installation, start-up and adjustment

  9. 9Testing

    L4, L5/IST, punch list, re-test

  10. 10Commissioning

    team, procedures, monitoring, SLA

Situations

When you need us

At the very start

The client knows they need a data centre but not what for. There are no functional requirements, no brief and no preliminary calculations.

A site for AI load

An investor or developer is designing a site for high rack density and liquid cooling.

A design in hand

The general designer lacks data-centre expertise and requirements for future operation.

Commissioning soon

The site is close to commissioning, but there is no team, no procedures and no tested failure scenarios.

Work

What we do

Control at every stage: from the first document to signed commissioning acts.

01
Requirements and FR

Functional requirements, pre-design and design briefs, capacity, reliability, phasing, room schedule.

Documents the client approves, hands to the designer and uses to request technical conditions (TU)

02
Pre-design

Site, energy balance, redundancy, layout options, budget based on comparable sites, roadmap under GOST R 58811-2020.

Parameters used to approve the budget and meet the technical conditions (TU)

03
Design

Design support: assignments for related sections, control of decisions at the design and working-documentation stages, preparation for expert review.

A design that accounts for acceptance and future operation

04
Design review

Uninterruptible and guaranteed power systems, UPS and gensets, 0.4 kV switchgear, points of failure, switching logic, maintenance without shutdown.

A risk register and comments that go into the design, not onto the site

05
Equipment procurement and acceptance

Specification, supplier pre-qualification, lead times, spares and service, FAT, SAT and SAP programmes in the supply contract.

The cost of operation, not just the price of supply and start-up

06
Construction and testing

Technical supervision during installation and start-up, loss of external power, failure of an uninterruptible power or cooling branch, partial automation, alarms.

L4 and L5/IST test reports, a closed punch list

07
Commissioning

Chief engineer and shift engineers, SOP, MOP and EOP, drills, SLA and KPI, incident reviews, preventive maintenance and spares.

At commissioning the site, the people and the processes are ready

First step

The first stage takes up to 20 working days

No documents yet

We start with requirements: client goals, site, functional requirements, pre-design brief.

You have FR, a brief or a design

We review the inputs. If you have both the brief and the FR, send both: discrepancies only show when the pair is reconciled.

Counted from receipt of the materials. Scope and price are set after we review the inputs.

Deliverables

  • Register of technical and operational risks
  • Comments on design decisions
  • Equipment requirements before the order is placed
  • Monitoring and automation requirements
  • Requirements for future operation
  • Testing and acceptance scope

Acceptance

A data centre is tested as a system

Integrated testing proves how the system behaves, not that all the equipment is in place.

Feed 110 kV · utility Feed 210 kV · utility Gensetsfuel 24 h TS · ATS0.4 kV switchboard · switchover in seconds UPS · batteriesdouble conversion · 2N Data hallIT load CoolingN+1 BMSDCIMevent → shift

Loss of both feeds

Loss of both utility feeds: the load holds on UPS, the gensets start, the site returns to the grid without a dip.

ScenarioMeasurementDecisionPunch listRe-test
ScenarioDetectionSwitchoverRecoveryVerdict
Loss of external power: UPS, gensets, returntime and signaltransfer to gensetsreturn without a dipPASS / FAIL
Failure of an uninterruptible power, cooling or automation branchalarmtransfer to redundancynormal modePASS / FAIL
Partial automation, manual controlmode recognitionshift actionsrecoveryPASS / FAIL
BMS and DCIM alarmseventescalation and responseentry in the historyPASS / FAIL

Sites

Projects

SochiIn progress · pre-design stage

High-performance computing data centre

Reconstruction of a building into a data centre for high-performance computing.

  • Concept and layout
  • Functional requirements for design
  • Pre-design brief, seven stages
  • Load balance across seven emergency modes
  • Roadmap under GOST R 58811-2020 and a participant matrix
Reliability
Tier III
Power
6.5 MW first stage, sketch up to 15 MW
Racks
107 server racks up to 35 kW, 25 network racks up to 20 kW
PUE
no more than 1.5, design 1.4
Redundancy
10 kV — 2N, 0.4 kV — 2N+1, fuel 24 h
Commissioning
three stages, two independent locations
Power by stage
6.5 MW first stage15 MW full-capacity sketch
Client not disclosedCalculation done

Pre-design calculation for a 6 MW AI data centre

The first phase is mixed: colocation sells from day one, the AI zone grows in blocks for a confirmed customer.

  • Energy balance with battery recharge and a check for degraded EER
  • Three risks before design: density growth, cluster power spikes, redundancy on a hot day
Composition
236 rack spaces, 4,052 kW IT within a 6 MW limit
Density
7 to 140 kW per rack
UPS
9,600 → 7,500 kW at the same load
Batteries
2,400 → 1,450 kWh, N+1 for the AI loop, 2N for the core
What the calculation changed
UPS
9,600 kW
7,500 kW
Batteries
2,400 kWh
1,450 kWh

initial design after calculation

Our experience

Our experience

Backbone networks and CDN

Operating a federal transport network with 99.9%+ availability, 24×7 emergency management, communication nodes, server rooms and mini-DCs.

Pakhra data-centre construction

Construction commission for a 20 MW data centre: inputs and brief, control of the ES, EM and EOM power sections, finding where construction works deviate from the working documentation, lab tests and as-built documents for commissioning.

Core Site power supply

Upgrading 0.4 kV switchgear, uninterruptible power systems and batteries at sites in Moscow, Novosibirsk and Perm; incident analysis and fewer points of failure.

Campus infrastructure

Campus engineering and IT systems, OPEX and contractors, building and equipping research spaces including an IT and AI centre.

Design documentation

Review of briefs, design and working documentation, comments to the general designer, as-built documents and acceptance.

24×7 operation

Shifts and SOP, MOP and EOP procedures, preventive maintenance and spares, incident management, SLA and failure analysis.

Team

Project leads

Kirill Sokolov
Kirill SokolovOperations · management · automation

Operated a federal operator’s transport network, led a department at a service provider, ran a university campus’s infrastructure.

  • Requirements and functional requirements documents
  • Site operating model and team
  • SOP, MOP, EOP, SLA, incident reviews
  • Operations monitoring and automation

SPbSMTU (State Marine Technical University), engineer, 2006 · Saint Petersburg Law Institute of the Prosecutor General’s Academy, 2012 · RANEPA, public and municipal administration, 2024

Stanislav Falaleev
Stanislav FalaleevEngineering infrastructure · power supply

17 years in power and operations: the full cycle of data-centre engineering infrastructure at CORE, CDN and SITE sites, upgrades of uninterruptible and guaranteed power systems, energy audits of industrial plants.

  • Uninterruptible and guaranteed power systems, UPS, gensets, batteries, 6–10/0.4 kV switchgear
  • Preventive maintenance, spares, OPEX and CAPEX, work with service companies
  • Review of briefs, design and working documentation, tenders
  • Construction and installation, start-up, load testing, as-built documentation
  • Incident analysis and fewer points of failure, SOP, MOP, EOP

Peter the Great St. Petersburg Polytechnic University, technical cybernetics, 2012 · Cherepovets Metallurgical College, power supply, 2006 · Electrical safety group V, Rostekhnadzor · 1C:TOIR, equipment repair management, 2023

Platform

Our tm.hub platform

We keep requirements, test results and records in our own platform: the same documents give the same result, and checks follow formalised rules.

Requirements register

The brief and FR are reconciled with each other and with design documents; changes are visible in the history.

Test trail

Programme, result, punch list and re-test are stored together.

Operations history

Procedures, incidents and reviews build up in the site’s knowledge base.

Reports from 1C

Stock, purchases, receivables and shipments right in the chat — during equipment procurement you can see what is paid for and what has arrived.

Reconciling a data-centre brief and FR set

54requirements
17findings
6critical
criticalSection 7 is missing from the list of sectionsSource: list of sections

Questions

In short

At what stage do you start?

Any: from the first discussion and functional requirements, on a finished design, before equipment procurement or before commissioning. The earlier, the cheaper it is to fix what we find.

Do you replace the general designer?

No. The general designer issues the documentation and goes through expert review. We are responsible for requirements, review of design decisions, equipment procurement and acceptance, and the site’s readiness for operation.

How long does it take and how much does it cost?

The first stage takes up to 20 working days from receiving the materials. We price the work from your brief: having built and run data centres for 15+ years, we see where a project will lose money and reliability and design that in from the first document.

What should we send to start?

Any inputs: functional requirements, brief, concept, design, specifications, technical conditions. If there are no documents, we start with a conversation about your goals and the site.

Do you work with AI data centres?

Yes. Densities up to 140 kW per rack and above, liquid cooling, different redundancy schemes for the AI loop and the core, cluster power spikes and genset load steps.

Where do you work?

Russia and neighbouring countries. We run projects in Saint Petersburg, Sochi, the Leningrad Region, Moscow and other regions.